The edging was also laid on a bed of mortar with the gap between pond and rock also pointed and sealed with black G4 resin. The underside of the slate rocks were given two coats of G4.
In total 2.5 tons of slate was used for the pond area with another 3 tons of crushed slate being added to the floor around the pond for landscaping. |